Infrastructure
Roads, power, water and drainage are already in place, so you can start building as soon as your drawings are approved.
- 15 m
- Main roads, 10 m RCC carriageway
- 150 mm
- Water pipeline along the roads
- DGVCL
- Power line brought to the park
- 3,956 sq.yd
- Common plots, with a pond
Built for trucks
Every plot faces a 15 m or 12 m road. Inside each 15 m road is a 10 m RCC carriageway, with drains on both sides and street lights along the way.
A look around the park
How the roads, the gate and the common areas are planned to look. These are artist's impressions: the factory buildings in them are illustrations, and every plot is sold as open land. See all 17 pictures and the walkthrough.





Provided at the park
These are in place today.
Internal roads
ProvidedTwo 15 m roads with a 10 m RCC carriageway, and a 12 m branch road with a 9 m carriageway. Every plot faces one of them.
Power
ProvidedA DGVCL electricity line is brought to the park. You apply to DGVCL for your own connection and load.
Water
ProvidedA 150 mm water pipeline runs along the internal roads.
Drainage
ProvidedDrains run along the internal roads.
Street lights
ProvidedAlong the internal roads.
Compound wall and gate
ProvidedA walled boundary with one controlled entry from the village road.
Security and CCTV
ProvidedA guarded gate and CCTV cameras.
Water pond
ProvidedIn the larger common plot. It collects rainwater and recharges the ground.
Also planned for the park
Shared spaces and green cover for everyone in the park.
Two common plots, 3,956 sq.yd
CP-1 of 3,000 sq.yd and CP-2 of 956 sq.yd. They belong jointly to the plot owners, as the NA order requires.
12 parking bays
Marked bays of 4 m × 5 m, in addition to the loading bay inside every plot.
1,344 trees
Tree plantation planned across the park.
4 rainwater recharge wells and the pond
The wells put rainwater back into the ground, and the pond collects rainwater as a large recharge source.
Fire safety
The layout carries fire prevention and life-safety provisions.